Monitor GF 500 Service Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
MONITOR HEATING SYSTEM
Section
2:
Installation
2-1
NOTICE
BEFORE
INSTALLATION
Refer
to the
service manual
of the
Monitor GF500
2-2
HEATER INSTALLATION
Refer
to the
service manual
of the
Monitor GF500
NOTE.-Use
the
cardboard template provided with
the
Heater
for
flue
pipe
location.
Just
in
case
the
template
was
misplaced,
the
approximate
flue pipe hole location measurements
are
follows:
The
center
of the
Joint Pipe
opening,
which connects
to
the
Flue Pipe.
Back
of
Healer
Fuel
Inlet
2-3
FLUE PIPE CLEARANCES
Refer
to the
service manual
of the
Monitor GF500
2-4
INSTALLING
AN
EXTENSION
KIT
Refer
to the
service manual
of the
Monitor GF500
2-5 GAS
CONNECTION
Refer
to the
service manual
of the
Monitor GF500
2-6 GAS
CONVERSION PROCEDURE
1.
Replace
the
natural orifice with
the LP
orifice
which
is
included
in the
conversion
kit.
Check orifice
fitting
for gas
leak
•Slide
the gas
type selector
on PCB to the LP
position.
•Check
that
the
manifold pressure matches
the
following
values.
If not
adjust them
-to the
following
values using volume
resister(VR1:Hi
VR2:Lo)on
the
PCB.
Hi:3.19"-S
2
5
W.C.
Lo:1.42"-g-
16
W.C.
After
check, reinstall fitting
and
check
for
leaks.
2-7
HIGH ALTITUDE INSTALLATION
All
Units must
be
installed according
to the
following
chart
to
determine which orifice will
be
used
for the
appropriate altitude.
NATURAL
GAS
UP
TO
2000 feet
No
changing orifice(2.38mm)
2000-6000
feet 2.28
mm
drill size orifice
LP
GAS
UP
TO
2000 feet
No
changing
orifice(1.87mm)
2000-6000
feet 1.78
mm
drill size orifice
</I\
WARNING:
Do
not use
above
6000
feet.
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 20 21

Comments to this Manuals

No comments